Do I need a permit for a kitchen renovation in Mission?
In Mission, a permit is required if your kitchen renovation involves moving plumbing, adding electrical circuits, or removing walls. Cosmetic upgrades like new cabinets, countertops, and backsplash typically do not require a permit.
How long does a building permit take in Mission?
Permit processing in Mission typically takes 4–12 weeks. More complex projects such as additions or structural work take longer. Applying online (if available) can speed up the process.
What happens if I renovate without a permit in Mission?
Renovating without a required permit in Mission can result in fines, orders to remove the work, difficulty selling your home, and insurance complications. Always check permit requirements before starting.
Can I apply for a permit online in Mission?
Yes — Mission offers online permit applications at https://mission.ca. This is generally faster than in-person applications.